Product Info
Current Problems & Hex-Hut Solutions


Download "Problem/Solution" chart in PDF format

Comparisons
Comparing traditional shelters with Hex-Hut Shelter Systems

Tasks

Can the shelter perform on... Traditional Shelter Hex-Hut Shelter System
uneven ground ? yes
joint near sleeper no yes
expansion loop ? (unlikely) yes
tie-in's ? yes
shoes ? (unlikely) yes
installation no yes
valve setting tie- in's no yes
valve setting fabrication ? yes
Q & T Pipeline yes* yes
ERW Pipeline yes* yes
lease piping yes* yes
field piping fabrication yes* yes
pad tie-in's yes yes
plant / field maintenance ? (depends) yes
plant shutdowns ? (depends) yes
fabrication ? (depends) yes
MIG, fluxcore, STT and stick operations yes yes
Note*: depends on ground conditions: (ie. height of pipe off the ground, uneven ground, etc.)

Specifications
What is required to/for... Traditional Shelter Hex-Hut Shelter System
set up / deployment 15 minutes 5 minutes
labour to set up 2 people 1 person
additional hardware yes no
labour to move 2 people (minimum) 2 people (maximum)
units mobilized at same time using a 1 ton truck 2 10
maximum height of pipe off ground 12 inches unlimited
total weight 153 lbs. 97 lbs.

The traditional shelters are designed specifically for underground pipeline construction. In comparison, the Hex-Hut Shelter System was designed specifically to handle all of the diverse tasks and challenges in the fabrication and construction of the steam injection process both above ground and underground.